SIMBIM

Cost estimating with Archicad and TCQ: from the IFC model to the budget

Webinar in SpanishRecorded on 30 June 2021Length 1:00:47

An introductory-level session in Spanish on cost estimating from an IFC model: how the model is prepared and filtered in Archicad, what IFC translator settings are needed for the quantities to travel with the file, and how that IFC is then linked to the work items in TCQ, the ITeC's time, cost and quality programme, through to obtaining the measurements and the budget.

A session in Spanish devoted to cost estimating from an IFC model, presented jointly by SIMBIM and by the ITeC, the Catalan Institute of Construction Technology. Martina D'Andrea works through the preparation and export of the model in Archicad, and a technician from the ITeC continues the workflow in TCQ, the institute's time, cost and quality programme, through to the budget. The level is introductory and everything rests on a single example, the Maison Dom-Ino, with columns, slabs and stairs. The first part insists that Open BIM is a process and not a file format, and that the end use conditions how you model: the same column resolved from slab face to slab face or continuous in height gives different volumes, and the criterion decides the measurement. On that basis, three recommendations are given before exporting: ask what information is needed and filter the model in a view, decide how it should come out by defining a translator, and check the result in a viewer before sending it. The work in Archicad is seen live: a general IFC translator is duplicated to create a dedicated one, the IFC 4 schema is chosen, BREP geometry and the export of the elements taking part in detection are switched on, and in the data conversion the quantities and the properties of building materials, elements and components are ticked. The file is generated from the publisher and opened in Solibri Anywhere to check geometry and metadata, where the difference can be seen between an element classified only in Archicad and a slab coming from the ITeC's eCOB standard. The second part takes place inside TCQ. The possible working schemes are explained, with IFC, with BC3 or with Excel, and the BIM Vision viewer is opened from the programme. In the window for linking BIM objects to work items, items are assigned to each type, copied between identical elements, and the property set is used to indicate which IFC datum feeds each measurement, with formulas where needed. The GUID maintains the link between model and budget, and on the eCOB elements a button is shown that associates the items with the BIM type. The measurements are then imported and the degree of BIM implementation is reviewed, which flags the items that carry a GUID. The session closes with the export of an IFC enriched with budget data, which was not opened live owing to a technical problem, and with a round of questions on platforms, units, translators and databases from other countries.

  • Why Open BIM is a working process and not simply a file format.
  • How the criterion by which an element is modelled changes the volume that ends up being measured.
  • What to ask before exporting: what information is needed and how it should come out.
  • How the model is filtered in a view so that only the elements to be measured go into the IFC.
  • How an Archicad IFC translator is duplicated to create one dedicated to this workflow.
  • What geometry and data conversion settings are needed for the quantities to travel in the IFC.
  • Why it is worth checking the file in a viewer before sending it to whoever is going to measure.
  • What the difference is between an element classified only in Archicad and one created according to the ITeC's eCOB standard.
  • How the IFC objects are linked in TCQ to the work items in the budget.
  • Why the GUID is the piece that holds model and budget together when the project changes.
  • How to indicate which IFC property feeds each measurement line and when formulas have to be used.
  • What the degree of BIM implementation shows about the items that do or do not carry a GUID.

  • 0:00 Bienvenida y presentación de la sesión
  • 0:50 Temario y estructura del seminario
  • 4:32 Qué es Open BIM: un proceso, no un formato
  • 5:49 El IFC como formato de intercambio entre herramientas
  • 7:01 Tres recomendaciones antes de exportar el modelo
  • 8:01 El modelo en Archicad y la vista filtrada para mediciones
  • 8:59 Clasificaciones y propiedades: elemento propio frente a objeto eCOB
  • 10:14 Crear un traductor IFC específico para este flujo
  • 11:42 Conversión de geometría: BREP y elementos en detección
  • 12:53 Conversión de datos: cantidades y propiedades de materiales
  • 13:57 Publicar el archivo IFC desde el publicador
  • 15:03 Comprobar geometría y metadatos en un visor
  • 17:06 ITeC, TCQ y la base de datos BEDEC
  • 22:17 Esquemas de trabajo entre Archicad y TCQ
  • 25:44 Estructura de capítulos y partidas del presupuesto
  • 27:27 Abrir el visor BIM Vision desde TCQ
  • 28:52 El GUID como identificador del elemento
  • 29:49 La biblioteca de objetos BIM del ITeC
  • 32:01 Vinculación de objetos BIM con partidas de obra
  • 35:07 Conjunto de propiedades: volumen, área y fórmulas
  • 39:04 Objetos eCOB: asociar las partidas al tipo BIM
  • 40:09 Importar las mediciones al presupuesto
  • 42:22 Grado de implementación BIM: partidas con y sin GUID
  • 44:20 Exportar un IFC enriquecido con datos de presupuesto
  • 49:30 Preguntas y respuestas

Watch this webinar in full, free

Create your free SIMBIM account to open this session and the rest of the SIMBIM Virtual Room. Already registered? Sign in.

Disclaimer — This session is published as it was recorded. Company and product names, logos, job titles, certifications, badges and partnership statements shown in it reflect the situation at the time of recording and may have changed since. Software versions and interfaces shown may also differ from current releases.

Presented by

  • Martina D'Andrea

← Recorded sessions