SIMBIM

Integrated 3D, 4D and 5D solutions: from Archicad to STR Vision CPM via IFC

Webinar in SpanishRecorded on 12 November 2017Length 49:38

A session recorded in 2017 that works through, on a practical case, the complete chain running from the BIM model to the cost estimate and the construction programme. The model of the Fira Barcelona entrance hall is built in Archicad, exported in IFC format and loaded into STR Vision CPM, where quantities are extracted from the building elements themselves, bill items are generated from price lists, model versions are compared and the Gantt chart for the works is assembled.

The session poses a simple question: once the BIM model has been built, what is done with the information it holds. The presenter starts from the time lost redoing and re-coordinating work, and places the concept of integrated solutions there. She clarifies from the outset that integrated does not mean doing everything inside a single tool, but chaining different tools together so that what is produced in design remains useful in cost estimating and on site. On that framework she arranges the 2D, 3D, 4D and 5D dimensions as types of information and uses, not as features of a product. The first half is demonstrated in Archicad on the model of the Fira Barcelona entrance hall, chosen for its barely orthogonal geometry. A column is selected and its properties opened to show that a building element holds far more than geometry: height, shape and materials, and alongside these a classification and non-graphical properties such as fire resistance or the storey it belongs to. That classification is not decorative, because it is what makes it possible to locate and filter the elements later on. From there the session moves to export in IFC format, with the caveat that exporting is not simply saving: it has to be decided what information goes out and how. The second half moves to STR Vision CPM, an application for quantity take-off, cost estimating and financial control of construction work, with a sheet-and-column interface close to Excel. The IFC is imported, displayed in the viewer, and each element is confirmed to retain its length, volume and area quantities. A bill item is then dragged from a price list in BC3 format onto the take-off sheet and the quantity is associated with it by reading it from the element's property. To avoid going one by one, the columns are filtered by material, a selection of eighty-four elements is obtained and the length of all of them is dragged across at once. The same approach extends to parametric rules: a measurement rule is created for columns with a tubular structure and saved in a reusable catalogue. Two versions of the IFC are then compared to locate the design differences, for example a slab in which stair openings have been made; the changes are not applied by themselves, the software flags them and the decision remains with the user. The closing section links the cost estimate with the Gantt chart and export to Primavera and Microsoft Project. It is worth watching it for what it is, a 2017 session: the versions and interfaces that appear on screen are those of the time.

  • What integrated solutions means when BIM work goes beyond the 3D model.
  • Why generating the model is not enough and the value appears when its data is reused in later stages.
  • What geometric and non-graphical information a building element holds inside Archicad.
  • Why the classification of the elements conditions every later use of the information.
  • How to decide what information is extracted when exporting an IFC file from Archicad.
  • How an IFC model is imported and displayed inside an STR Vision CPM project.
  • How a bill item is dragged from a price list in BC3 format onto the take-off sheet.
  • How model elements are filtered by property in order to measure many of them at once.
  • How a parametric measurement rule is created and saved in a reusable catalogue.
  • How two versions of the IFC are compared to locate the design changes and decide which ones are applied.
  • How to move from the cost estimate to the Gantt chart while keeping the link with the model.
  • What is done with the bill items that have no geometry in the model.

  • 0:00 Apertura: soluciones integradas 3D, 4D y 5D
  • 2:32 Transformación digital: tiempo perdido y trabajo rehecho
  • 4:38 Por qué generar el modelo 3D no basta por sí solo
  • 7:51 Las dimensiones 2D, 3D, 4D y 5D como tipos de información
  • 8:23 Integrado no significa hacerlo todo en una herramienta
  • 9:46 El caso de estudio: el hall de Fira Barcelona en Archicad
  • 11:03 Propiedades geométricas de un pilar
  • 11:53 Clasificación y propiedades no gráficas del elemento
  • 13:04 Exportación a IFC: decidir qué información se extrae
  • 15:03 Paso a STR Vision CPM para costes y tiempos
  • 16:25 El presupuesto tradicional: escalímetro, CAD y listas de precios
  • 17:17 Mediciones leídas del modelo en lugar de medidas manuales
  • 21:35 Listas de precios, formatos BC3 y Excel
  • 22:37 Importación del IFC dentro del proyecto
  • 26:26 Primera partida arrastrada desde la lista de precios
  • 29:49 Filtrado de pilares por material y medición del conjunto
  • 32:32 Reglas paramétricas de medición guardadas en catálogo
  • 35:47 Comparación de versiones del IFC y control de cambios
  • 37:51 Del presupuesto actualizado al diagrama de Gantt
  • 39:46 Exportación a Primavera y Microsoft Project
  • 45:26 Preguntas: interoperabilidad con otras plataformas vía IFC
  • 47:35 Preguntas: partidas sin geometría en el modelo

Watch this webinar in full, free

Create your free SIMBIM account to open this session and the rest of the SIMBIM Virtual Room. Already registered? Sign in.

Disclaimer — This session is published as it was recorded. Company and product names, logos, job titles, certifications, badges and partnership statements shown in it reflect the situation at the time of recording and may have changed since. Software versions and interfaces shown may also differ from current releases.

Presented by

  • TeamSystem Italy

← Recorded sessions